Nogales, Arizona, USA

Nogales, Arizona, USA

Peña Blanca Wastewater System Improvements at Potrero Creek in Nogales, Arizona

Project Status: Completed

Datos Generales

General Information

Sector

Wastewater

Promoter

City of Nogales

Benefited population

1,262

Certification date

November 8,2018

Financiamiento

Financing

Project cost

US$709,822

NADBank Funds

US$446,400 - CAP grant

Documentos relacionados

Related documents

Background

Peña Blanca is a 50-acre development northwest of the city of Nogales in southeastern Santa Cruz County, Arizona.  It has a gravity wastewater system that provides service to 75 homes, a middle school, and an elementary school. The Peña Blanca Pump Station, located 0.5 miles northeast of the subdivision, conveys flows from the Peña Blanca sewer system to the International Outfall Interceptor (IOI). The force main from the Peña Blanca Pump Station to the interconnection point at the IOI was originally buried under the creek bed; however, storms and other weather conditions eroded the wash bed, leaving the pipeline exposed at the Potrero Creek crossing. This situation made the pipeline more vulnerable to failures resulting in wastewater spills, which posed an environmental and health risk for nearby wells in the community of Rio Rico that provide drinking water to approximately 19,000 residents and are located downstream of the Peña Blanca force main at Potrero Creek.

In addition, the Peña Blanca Pump Station was designed to manage the anticipated flows from a subdivision plotted for1,000 homes. Consequently, the facility and equipment were oversized for actual flows. Moreover, it did not have telemetry technology, which prevented the utility from effectively managing the equipment in accordance with changes in demand.

Project Scope

The project consisted of the replacing and relocating approximately 764 lineal feet of a sanitary sewer force main below Potrero Creek and improvements at the Peña Blanca Pump Station on the northwest side of the city. 

Benefits

Replacing the force main eliminated the risk of line failures that could result in up to 84,000 gallons per day (gpd) of untreated wastewater discharges to Potrero Creek, protecting nearby water wells from potential contamination and improving wastewater services for 75 existing residential connections and two public schools.  The pump station improvements allow for remote monitoring and management capabilities, resulting in better energy efficiency and lower operation and maintenance costs.