Nogales, Arizona, USA
Nogales, Arizona, USAPeña Blanca Wastewater System Improvements at Potrero Creek in Nogales, Arizona
Project Status: Completed

General Information
Sector
Wastewater
Sponsor
City of Nogales
Benefited population
1,262
Certification date
November 8,2018
Financing
Project cost
US 0.71 million
NADBank Funds
US 0.45 million - NADBank Grant: CAP
Related documents
Project Description
The proposed project consists of the relocation of approximately 764 lineal feet of a sanitary sewer force main below Potrero Creek and improvements at the Peña Blanca Pump Station on the northwest side of the city of Nogales, Arizona (the “Project”).
Objective
The purpose of the Project is to eliminate the risk of untreated or inadequately treated wastewater discharges to Potrero Creek, thereby contributing to the protection of natural water resources and reducing the risk of waterborne disease. Additionally, improvements to the pump station will improve the operational efficiency of the wastewater system.
Expected Outcomes
The Project is expected to generate environmental and human health benefits related to the following Project outcomes: Improve wastewater services to 75 existing residential connections and two public schools. Eliminate the risk of line failures that could result in approximately 84,000 gallons per day (gpd) of untreated or inadequately treated wastewater discharges. Achieve full compliance with applicable regulations. Increase operational efficiency of the wastewater system, which will reduce energy costs and maintenance requirements.