Dixieland, California, USA
Dixieland, California, USASEPV Imperial Solar Project in Dixieland, California
Project Status: Completed

General Information
Sector
Solar energy
Sponsor
SEPV Imperial, LLC
Benefited population
6,436
Certification date
November 15,2016
Financing
Project cost
Reserved
NADBank Funds
US 9.66 million - NADBank Loan
Related documents
Background
The State of California has legislated goals requiring all electricity retailers in the state to generate a progressively greater percentage of their retail sales from renewable energy. State Senate Bill 350 signed in October 2015 required that the target of electricity generation from renewable resources be increased from 33% by 2020 to 50% by 2030. Since 2009, the Imperial Irrigation District (IID)—the sixth largest public power utility in the state, managing more than 1,100 MW of power plant capacity—has taken several steps to increase its renewable energy mix, including through power purchase agreements for biomass and solar energy.
Project Scope
The project consisted of the design, construction and operation of two solar facilities: SEPV Dixieland West with a generation capacity of 3.0 megawatts of alternating current (MWAC) and SEPV Dixieland East with a capacity of 2.0 MWAC. The electricity generated by the solar parks is being purchased by IID.
Benefits
Reduced demand for traditional fossil-fuel based energy generation resulting in less greenhouse gases, thus improving air quality, while providing the citizens of Dixieland, with a safe, reliable energy alternative. Specifically, the project is expected to help prevent the emission of more than 4,319 metric tons/year of carbon dioxide (CO2), as well as other pollutants.