Anthony, New Mexico, USA
Anthony, New Mexico, USAWater Improvements Project in Anthony, New Mexico
Project Status: Completed

General Information
Sector
Water
Sponsor
Anthony Water & Sanitation District
Benefited population
8,388
Certification date
May 20,2011
Financing
Project cost
US 8.82M
NADBank Funds
US 2.76M - NADBank Grant: BEIF
Related documents
Background
The initial condition to be addressed for the project was the existence of Nitrate at Well # 4, identified by the New Mexico Environment Department (NMED) in March 2004. NMED issued a violation notice with an order to stop production at the site. Consequently, the project sponsor placed the well offline and increased production at the remaining sources (six wells). However, this temporary solution was flawed because of several factors, including the over-extraction of water supply at the wells beyond their ground water pumping diversion allotments and insufficient water quality which contains arsenic above the maximum contaminant level (MCL). The current EPA standard for arsenic in drinking water is 10 ppb. After drilling a new well at the Well#4 site, Nitrates were no longer present; therefore, the project was re-scoped to achieve compliant arsenic levels.
Description
The purpose of the project was to improve water quality through a Reverse Osmosis arsenic removal treatment system and the construction and rehabilitation of wells, which contributes to the reduction of the risk of water borne diseases associated with high levels of arsenic.
Benefits
The project consists of the construction of a drinking water treatment plant and associated water well equipment in Anthony, New Mexico.